The Odborárska Boiler plant, Bratislava

ENGIE Services has operated the former “Dimitrovka” heat management system since 2005.  An investment of 2.3 million EUR resolved problems with the heat supply in this area. As part of the reconstruction the new 8 MW gas boiler plant was built, 1.7 km of the primary steam distribution system was replaced by a hot water distribution system and the secondary distribution system partially replaced.